SH130 Corridor

 
Project Profile Contractor Owner Partners Engineer Completion Date Project Value
SH130 Corridor Lone Star Infrastructure Texas Tollway Authority Texas Tollway Authority, Texas DOT LSI Consortium including Fluor, Balfour Beatty,
DMJM+Harris and others
Under Contsruction
1.5 Billion
 
SH130 Corridor
click image to enlarge
Project Summary
  • Largest toll road financing project in the nation
  • SH 130 consists of a 49 mile toll way and approx. 80 bridge structures
  • Through a VE proposal, United Fiberglass was allowed to redesign a 12‐way conduit hanger system for each bridge, resulting in a 50% savings on material and labor
  • United supplied 77,000' of fiberglass conduit and 510 hanger supports to the first phase of the project along with signed and sealed material specifications and on‐site contractor training
logos